Galvanised steel fence posts receding along a slope stabilisation site in Hong Kong, hard midday shadows, orange safety netting visible in background
Accepting Government & Private Tenders — Q2 2026

The Fencing Subcontractor
Main Contractors
Stop Qualifying.

BD14 forms filed before you ask. $20M third-party insurance on every contract. Chain-link to acoustic panels — drilled into Hong Kong granite, compliant from day one.

BD Licensed

HK-FNC-2847

ISO 9001

Certified 2024

$20M PL Insured

Third-party liability

Buildings Department Licensed · HK-FNC-2847·ISO 9001:2015 Certified·$20M Third-Party Liability Insurance·BD14 Compliance Filing·HOKLAS Tested Materials·Kwai Tsing Port Approved·Slope Works Specialist·MTR Corridor Acoustic Panels·2,400+ Linear Metres Installed 2025·Zero BD Rejection Record·Buildings Department Licensed · HK-FNC-2847·ISO 9001:2015 Certified·$20M Third-Party Liability Insurance·BD14 Compliance Filing·HOKLAS Tested Materials·Kwai Tsing Port Approved·Slope Works Specialist·MTR Corridor Acoustic Panels·2,400+ Linear Metres Installed 2025·Zero BD Rejection Record·
Technical Specification

Fence Type Comparison Matrix

Every figure is drawn from actual BD-approved installations in Hong Kong. Wind-load ratings tested to HKWC-2004. Costs are installed inclusive of posts, concrete, and labour — no hidden preliminaries.

Download PDF Table
Chain-Link (Galvanised)Most Ordered
Wind-Load RatingUp to 1.5 kPa
BD Compliance ClassClass A / BD14 compliant
Corrosion Warranty15-year hot-dip warranty
Installed Cost / lmHK$180–260 /lm
Typical ApplicationSlope works, site perimeters
Welded Mesh Panel
Wind-Load RatingUp to 2.0 kPa
BD Compliance ClassClass A / BD14 compliant
Corrosion Warranty10-year powder-coat warranty
Installed Cost / lmHK$320–480 /lm
Typical ApplicationHousing estates, school perimeters
Palisade SteelHigh Security
Wind-Load RatingUp to 2.5 kPa
BD Compliance ClassClass B / BD14 compliant
Corrosion Warranty12-year hot-dip + paint warranty
Installed Cost / lmHK$520–780 /lm
Typical ApplicationUtility substations, secure compounds
Acoustic Panel (MTR Grade)EPD Certified
Wind-Load RatingUp to 3.0 kPa
BD Compliance ClassClass C / BD14 + EPD compliant
Corrosion Warranty20-year aluminium frame warranty
Installed Cost / lmHK$1,200–1,800 /lm
Typical ApplicationRailway corridors, expressway margins
Razor Coil (BTO/Concertina)
Wind-Load RatingN/A — Topping application
BD Compliance ClassBD14 compliant (topping only)
Corrosion Warranty10-year stainless / galvanised
Installed Cost / lmHK$95–140 /lm
Typical ApplicationContainer yards, port perimeters

Need a spec sheet for your tender package?

Download the full comparison table as a branded PDF — includes BD licence number and HOKLAS test references.

Download PDF Table
Transparent Process

Six-Stage Project Audit Trail

Click each stage to see the actual documents produced. Nothing hidden. Every deliverable is specified before the contract is signed.

Expand each stage for full document list

Our licensed surveyor visits the site to assess ground conditions, measure linear metreage, identify granite bedrock depth, and photograph existing features. A formal survey report is produced — this becomes the basis for all BD submissions.

Documents Produced

📋Site Survey Report🗺️Ground Condition Assessment📷Photographic Record📊Preliminary BOQ

Deliverable: Signed survey report issued to contracts manager within 48 hours.

We prepare and file the BD14 Minor Works Permit application under Buildings Ordinance Cap. 123. All structural calculations for wind-load compliance and post-spacing are submitted with the application. Our zero-rejection record means no delays from incomplete documentation.

Documents Produced

📝BD14 Minor Works Form📐Structural Calculation Sheet💨Wind-Load Compliance Report (HKWC-2004)📋Material Specification Schedule

Deliverable: BD approval notification forwarded same day received.

Materials are sourced from HOKLAS-accredited suppliers. Mill certificates for every batch of steel are filed before delivery to site. Chain-link is hot-dip galvanised to BS EN ISO 1461. Acoustic panels carry EPD certification where required by EPD conditions.

Documents Produced

🏭Mill Certificates (BS EN ISO 1461)🔬HOKLAS Test Reports🌿EPD Material Certificates🚚Delivery Dockets

Deliverable: Full material file handed to main contractor QS before installation commences.

Posts are drilled into granite using rotary percussion rigs — no hand-dug footings on slope works. Concrete is batched to 35MPa minimum. Every post is plumbed with a digital level. Our site supervisor holds a valid CSCS card and the site safety plan is filed with the main contractor HSE officer before work begins.

Documents Produced

⛑️Site Safety Plan🏗️Concrete Batch Records (35MPa)📸Daily Installation Progress Photos🪪CSCS Card Copies — All Operatives

Deliverable: Daily progress report issued every evening by 18:00.

Post-installation inspection covers post plumb tolerance (±5mm/m), mesh tension, gate alignment, and razor coil attachment security. HOKLAS-accredited test results for acoustic insertion loss are provided where acoustic panels are installed. Photographic evidence is compiled into an inspection dossier.

Documents Produced

🔍Post-Installation Inspection Report🔊HOKLAS Acoustic Test Results📏Plumb Tolerance Records📁Photographic Completion Dossier

Deliverable: Inspection dossier issued within 24 hours of inspection.

A full handover pack is assembled and delivered to the main contractor: BD completion notice, all test certificates, warranty documents, and as-built drawings. Warranty periods are as specified in the comparison table above. Our $20M PL insurance policy schedule is included in every handover pack.

Documents Produced

BD Completion Notice📜Warranty Certificate📐As-Built Drawings🛡️$20M PL Insurance Schedule

Deliverable: Handover pack delivered in hard copy and PDF. Defects liability period commences from this date.

Request Subcontractor Pack

Includes BD licence, insurance schedule, and full document checklist

2,400+

Linear Metres Installed

FY 2025

47

BD14 Submissions Filed

Zero rejections

$20M

Third-Party PL Cover

Every contract

12yr

Avg Corrosion Warranty

Across all systems

Credentials on File

Every Qualification. Pre-loaded.

Main contractors spend weeks chasing subcontractors for compliance documents. Ours are in your inbox before the first site visit.

Buildings Department Licensed

Licence No. HK-FNC-2847

Registered minor works contractor under Buildings Ordinance Cap. 123. Authorised to file BD14 forms independently.

ISO 9001:2015 Certified

Cert. No. QMS-HK-20241103

Quality management system certified by HKQAA. Covers site survey, procurement, installation, and handover processes.

$20M Public Liability Insurance

AXA Hong Kong — Policy Active

Third-party liability cover of HK$20 million on every contract. Certificate provided with subcontractor pack, no request needed.

HOKLAS Accredited Testing

Lab No. HOKLAS-0312

All material testing conducted through HOKLAS-accredited laboratories. Test reports are traceable and accepted by BD and EPD.

"

We stopped asking fencing subcontractors for their BD licence and insurance. Barrier sends it before we ask. That alone saves our procurement team three days per tender.

WC

Wong Chi-fai

Contracts Manager — Gammon Construction Ltd

BD Submission Lead Time48 hrs
Insurance CertificateImmediate
ISO CertificateWith First Quote
Mill Certs on DeliveryEvery Batch
Subcontractor Pack

Request Your Pack.
Under 40 seconds.

Fill in your project details and we'll return a complete subcontractor pack — BD licence, insurance certificate, ISO cert, and preliminary pricing — within one working day.

BD Licence Certificate (HK-FNC-2847)
$20M PL Insurance Schedule
ISO 9001:2015 Certificate
Branded Fence Comparison PDF
Preliminary Cost Schedule
BD14 Process Timeline

Direct Line

+852 2555 1847tenders@barrierhk.com
Unit 12, Kwai Chung Industrial Centre, Kwai Tsing, NT

BD Licence HK-FNC-2847 · ISO 9001 Certified · $20M PL Insured