
The Fencing Subcontractor
Main Contractors
Stop Qualifying.
BD14 forms filed before you ask. $20M third-party insurance on every contract. Chain-link to acoustic panels — drilled into Hong Kong granite, compliant from day one.
BD Licensed
HK-FNC-2847
ISO 9001
Certified 2024
$20M PL Insured
Third-party liability
Fence Type Comparison Matrix
Every figure is drawn from actual BD-approved installations in Hong Kong. Wind-load ratings tested to HKWC-2004. Costs are installed inclusive of posts, concrete, and labour — no hidden preliminaries.
| Fence System | Wind-Load Rating | BD Compliance Class | Corrosion Warranty | Installed Cost / lm | Typical Application |
|---|---|---|---|---|---|
Chain-Link (Galvanised) | Up to 1.5 kPa | Class A / BD14 compliant | 15-year hot-dip warranty | HK$180–260 /lm | Slope works, site perimeters |
Welded Mesh Panel | Up to 2.0 kPa | Class A / BD14 compliant | 10-year powder-coat warranty | HK$320–480 /lm | Housing estates, school perimeters |
Palisade Steel | Up to 2.5 kPa | Class B / BD14 compliant | 12-year hot-dip + paint warranty | HK$520–780 /lm | Utility substations, secure compounds |
Acoustic Panel (MTR Grade) | Up to 3.0 kPa | Class C / BD14 + EPD compliant | 20-year aluminium frame warranty | HK$1,200–1,800 /lm | Railway corridors, expressway margins |
Razor Coil (BTO/Concertina) | N/A — Topping application | BD14 compliant (topping only) | 10-year stainless / galvanised | HK$95–140 /lm | Container yards, port perimeters |
Costs are indicative Q1 2026 market rates, inclusive of all materials and installation. Final pricing subject to site survey. BD compliance class per Buildings Department circular 2023.
Need a spec sheet for your tender package?
Download the full comparison table as a branded PDF — includes BD licence number and HOKLAS test references.
Six-Stage Project Audit Trail
Click each stage to see the actual documents produced. Nothing hidden. Every deliverable is specified before the contract is signed.
Our licensed surveyor visits the site to assess ground conditions, measure linear metreage, identify granite bedrock depth, and photograph existing features. A formal survey report is produced — this becomes the basis for all BD submissions.
Documents Produced
Deliverable: Signed survey report issued to contracts manager within 48 hours.
We prepare and file the BD14 Minor Works Permit application under Buildings Ordinance Cap. 123. All structural calculations for wind-load compliance and post-spacing are submitted with the application. Our zero-rejection record means no delays from incomplete documentation.
Documents Produced
Deliverable: BD approval notification forwarded same day received.
Materials are sourced from HOKLAS-accredited suppliers. Mill certificates for every batch of steel are filed before delivery to site. Chain-link is hot-dip galvanised to BS EN ISO 1461. Acoustic panels carry EPD certification where required by EPD conditions.
Documents Produced
Deliverable: Full material file handed to main contractor QS before installation commences.
Posts are drilled into granite using rotary percussion rigs — no hand-dug footings on slope works. Concrete is batched to 35MPa minimum. Every post is plumbed with a digital level. Our site supervisor holds a valid CSCS card and the site safety plan is filed with the main contractor HSE officer before work begins.
Documents Produced
Deliverable: Daily progress report issued every evening by 18:00.
Post-installation inspection covers post plumb tolerance (±5mm/m), mesh tension, gate alignment, and razor coil attachment security. HOKLAS-accredited test results for acoustic insertion loss are provided where acoustic panels are installed. Photographic evidence is compiled into an inspection dossier.
Documents Produced
Deliverable: Inspection dossier issued within 24 hours of inspection.
A full handover pack is assembled and delivered to the main contractor: BD completion notice, all test certificates, warranty documents, and as-built drawings. Warranty periods are as specified in the comparison table above. Our $20M PL insurance policy schedule is included in every handover pack.
Documents Produced
Deliverable: Handover pack delivered in hard copy and PDF. Defects liability period commences from this date.
Includes BD licence, insurance schedule, and full document checklist
2,400+
Linear Metres Installed
FY 2025
47
BD14 Submissions Filed
Zero rejections
$20M
Third-Party PL Cover
Every contract
12yr
Avg Corrosion Warranty
Across all systems
Every Qualification. Pre-loaded.
Main contractors spend weeks chasing subcontractors for compliance documents. Ours are in your inbox before the first site visit.
Buildings Department Licensed
Licence No. HK-FNC-2847
Registered minor works contractor under Buildings Ordinance Cap. 123. Authorised to file BD14 forms independently.
ISO 9001:2015 Certified
Cert. No. QMS-HK-20241103
Quality management system certified by HKQAA. Covers site survey, procurement, installation, and handover processes.
$20M Public Liability Insurance
AXA Hong Kong — Policy Active
Third-party liability cover of HK$20 million on every contract. Certificate provided with subcontractor pack, no request needed.
HOKLAS Accredited Testing
Lab No. HOKLAS-0312
All material testing conducted through HOKLAS-accredited laboratories. Test reports are traceable and accepted by BD and EPD.
We stopped asking fencing subcontractors for their BD licence and insurance. Barrier sends it before we ask. That alone saves our procurement team three days per tender.
Wong Chi-fai
Contracts Manager — Gammon Construction Ltd
Request Your Pack.
Under 40 seconds.
Fill in your project details and we'll return a complete subcontractor pack — BD licence, insurance certificate, ISO cert, and preliminary pricing — within one working day.